most of the available time without interfering with other contractors
as they worked on different facets of the construction site.
In order to have access to the job site without interfering with
other contractors, the installation team worked late at night. Using
the sites downtime in activity allowed PTI to achieve completion
by the deadline without an increase in the cost of the installation
or affecting other on-site work being done.
The benefits of using Preserved Trees in this installation are
many. Like all of Preserved TreeScapes Internationals installations
this site didnt require the extensive infrastructure needed
by live foliage such as drainage and watering systems or overly
particular lighting. In addition to these benefits there is a substantial
annual savings in upkeep and maintenance, as the 32' Phoenix Dactylifera
with molded trunks used in this installation only require occasion
cleaning.